Open Access
1.What is Open Access(OA)?
The definition of Open Access in the Electricity Act, 2003, is “the non-discriminatory provision for the use of transmission lines or distribution system or associated facilities with such lines or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission”.
Approvals For Open Access










Power Trading
We have equipped with the team and techniques to obtain the related approvals in committed timeline approval. We have framed a time-driven and activity flow approach to complete every project before/within committed time-frame. Our association with the key nodes and ground presence has always given us advantage over to other to get our project delivered in the stipulated time.
“Power trading refers to purchasing and selling power between participants in the energy industry”. Moving with the core concept of the power trading we have equipped models and framework that are most profitable in todays scenarios. The integrated team approach has provided us the grasp in all the platforms with success rate of 100%. Our collaborations and expert advise has help many of clients to obtain the maximum profit while moving with our combinations of strategies and methodology.
ABT Metering and Installation
We have been instrumental in installation of ABT meter in all the areas of North India and have completed the projects in the no-deviating timeline model. We are the pioneer in creating a bridge between the government and the industries so that smooth business benefits can be obtained and a win-win situation can be formulated.
Grid Synchronization Activity
In todays age the Grid stability is the top-most important aspect for any commodity in the power sector. Understanding the highly sensitive area we have framed a mechanism where clients can smoothly connected to the grid system and get their plant charged and get their unit integrated in the Indian grid.
Billing Settlement of Open Access
Top Notch Energy Solutions Settlement system aids utilities and industries in managing their commercial contracts. Commercial considerations like the tariff agreement rules, charges being levied etc., are taken into account in these bills and reports.
2.What is STOA, MTOA & LTOA?
STOA or Short Term Open Access means open access for a period up to one month at a time. MTOA or Medium Term Open Access means the right to use the inter-state transmission system or distribution system for a period exceeding three months but not exceeding five years LTOA or Long Term open Access means the right to use the intra-state transmission system or distribution system for a period exceeding 7 years.
Frequently Asked Questions
3.Minimum requirement for open access power
Minimum volume of power should be 1 MW i.e. any consumer having connected load of 1 MW and above can avail open access. Thus, industrial and commercial consumers like office complexes, hotels, hospitals, shopping malls and other large establishments can avail Open Access.